Solar Simulation Test Equipment NL-RGZ-1500 400-1500W/m2 AM1.5G Class A Dual 1m2 Matrix Independent Angle 0-2m Lift Plus or Minus 2 Percent Uniformity Refrigerant Leak Interlock AC Solar Load Testing
Air Pressure Switch Endurance Test Bench NL-FYK-2 Two Stations 0.1Pa to 1MPa Wide Range NO-NC Auto Detection 15-50 Cycles per Min Nitrogen PID 99999999 Counts GB/T 14536.7-2024 Gas Water Heater Wall Boiler Pressure Switch Testing
Central Sensor Diaphragm Endurance Test Machine NL-ZXCG-2 Two Stations Stepper Press-Hold-Release Automatic Cycle 0-5000N Force Monitoring Over 20000N Capacity 1-10 Cycles per Min 999999 Counts GB/T 14536.7-2024 Electric Pressure Cooker Sensor Testing
High Frequency Solenoid Valve Flow-Current Characteristic Test Machine NL-HWHY-2 Two Stations 12 Characteristic Tests Hysteresis Response Repeatability 0-3000mA Drive 100-4000Hz Dither 50-400mA 20kHz Sampling 1-150bar plus or minus 1 percent FS GB/T 15623 Electrically Modulated Valve Testing
Model: NL-FWF-1
The pressure limiting valve, safety valve and relief structure are one-shot parts: failing to open is an accident and opening too early is a complaint. Yet factory verification still reads a single gauge peak, six pressure tests need three sets of fixtures, burst pressure needs a separate hydraulic bench, and every cooker model starts the scramble over again.
The bench covers six pressure tests that GB 13623 and GB 15066 require: working pressure at 0.9 to 1.1 times nominal P, safety pressure at 1.4 to 2.0P, heat resistance at 2.0P held 1min, internal pressure at 3.0P held 30s, relief pressure at 2.0 to 3.5P with gauge pressure within 20kPa sixty seconds after relief, and burst pressure at 6.0P and not below 500kPa. A 2kW electric hot plate heats the cooker; a dedicated hose connector with vent valve links the pressure limiting or safety valve port to a pressure sensor and computer, so the whole pressure-time curve is recorded and the peak is read automatically. Cover closing torque is graded by cooker size: 6Nm for C18 and C20, 9Nm for C22 and C24, 12Nm for C26 and C28, with the pot filled to 50 percent of its volume. Working pressure takes the peak over 30s after continuous venting; safety pressure is observed for 120s from the first safety valve release and the test stops if the upper limit is exceeded. Heat resistance is held at 2.0P for 1min followed by a sealing re-check. Internal and burst pressure are supplied by a hydraulic pump, with 1 to 1.6L/min during the burst stage and the value read when water overflows the rim. A transparent guard keeps relieved parts from flying off, and the run is aborted if pressure reaches the relief limit without venting. One cooker completes the sequence working, safety, heat resistance, relief, internal and burst, with the destructive stage placed last.
GB 13623-2003 Aluminium pressure cookers, safety and performance requirements; GB 15066-2004 Stainless steel pressure cookers; GB 13623-2026 Safety technical specification for pressure cookers was issued on 2026-09-28 and takes effect on 2027-10-01, replacing both standards, and the bench reserves margin for its pressure and timing values; specific multipliers and judgement follow the product specification or technical agreement.
Type testing and batch sampling at pressure cooker manufacturers; safety valve and relief structure verification at cookware and hardware plants; pressure cooker safety testing at inspection bodies; non-reset behaviour confirmation before a new model is released
Guangdong Endurance Electronic Equipment Co., Ltd provides non-standard customization, drawing confirmation, factory acceptance, on-site installation and commissioning, operation training and long-term technical service; 12-month warranty and long-term spare parts supply. Tel: 0760-88500902 / 13416787649. Web: en.zsnaili.com.