Coffee Machine Funnel Pressure Test Fixture Set NL-KFLDJ-12 12 Pieces 0-30bar Pressure Gauge with Silicone Boot Drain and Relief Valves Temperature Connector Universal for Finished and Sub-Assembly Testing
Walk-In Environmental Test Chamber NL-HJS-1 Cold-Room Type 42.5m3 -30 to 70C Uniformity 0.5C 150mm B1 Fire-Retardant Panels 3x2m Double Door Dual Power Supply DN65 Water Inlet and Drain 10 Thermocouple Ports Large-Unit Environmental and Energy Testing
Refrigerant Simulated Leakage Test Room NL-ZLYL-1 R290 R32 R1270 R600a Flammable Refrigerants GB4706.32 22.107-22.109 GB4706.13 Adjustable Leak Points Continuous Concentration Sampling Ventilation Safety Interlock
Ceramic Part Aging Pressure Test Apparatus NL-TCH-15 15MPa Pressure Vessel GB4706.1 Clause 22.32 Ceramic Material Parts Settable Holding Time Bench Type with Sealed Lid and Safety Protection
Model: NL-KFZJ-2
After the housing goes on, the finished unit faces the closing check before shipment: outlet volume, outlet temperature, power and steam-pipe water content - four data points that take a dozen minutes per machine by hand and leave no record. A housed machine hides leaks far better than a bare sub-assembly, and by the time the customer finds one, after-sales cost has multiplied.
The programmable flow table runs the sequence automatically: intelligent water filling to the set flow, the machine powered into its modes, outlet volume and outlet temperature sampled at the extraction head, a power meter above 3000W reading to two decimals, and steam-pipe water content monitored throughout - all four recorded and written to MES, with any excursion protecting the station and lighting the lamp. The built-in 0-25bar gauge reads extraction pressure directly. Two stations run independently on a 600x1200mm drain-fitted bench of splash-proof fire-retardant board; per-station and master leakage switches give two levels of protection; 5-pin sockets include one UK 3-pin; the independent variable supply 110-240V covers export models. Two units supplied and wired side by side form a four-station line, at roughly 3-5 minutes per machine.
The assessment follows the leakage current and structural safety clauses of GB 4706.1 General requirements for household and similar electrical appliances, with whole-machine safety under GB/T 4706.19-2024; the four judgement thresholds and the test flow follow the customer technical agreement and the machine specification.
Off-line functional checks and closing quality gates at coffee machine plants; export-line (UK plug) upgrades; MES traceability of finished-unit data and re-judgement of returned units
Guangdong Endurance Electronic Equipment Co., Ltd provides non-standard customization, drawing confirmation, factory acceptance, on-site installation and commissioning, operation training and long-term technical service; 12-month warranty and long-term spare parts supply. Tel: 0760-88500902 / 13416787649. Web: en.zsnaili.com.