Coffee Machine Endurance Aging Test Bench NL-KFSMT-10 10 Independent Stations 4-Mode Program Cycle Extraction Pressure 0-3MPa 0.01MPa Accuracy 5 Pneumatic Fingers Auto Knob Turning Auto Water Filling 30kV Variable Supply MES Upload
Coffee Machine Finished-Unit Functional Test Bench NL-KFZJ-2 2 Stations 2 Units Parallel Layout Outlet Volume Temperature Power Steam-Pipe Water Content Power Meter 3000W Two Decimals 25bar Gauge Programmable MES Upload
Coffee Machine Funnel Pressure Test Fixture Set NL-KFLDJ-12 12 Pieces 0-30bar Pressure Gauge with Silicone Boot Drain and Relief Valves Temperature Connector Universal for Finished and Sub-Assembly Testing
Walk-In Environmental Test Chamber NL-HJS-1 Cold-Room Type 42.5m3 -30 to 70C Uniformity 0.5C 150mm B1 Fire-Retardant Panels 3x2m Double Door Dual Power Supply DN65 Water Inlet and Drain 10 Thermocouple Ports Large-Unit Environmental and Energy Testing
Model: NL-KFBCT-4
The sub-assembly stage is where rework cost splits: whether the boiler leaks, whether the pump works, whether the mainboard program is right - all of it must surface before the housing goes on. Found on a finished machine, every fault means stripping one unit to repair it, and rework hours multiply. A bare sub-assembly also has no housing to protect it, so the station must give the exposed water circuit and electrics a splash-proof bench and dependable leakage protection.
Four stations run in parallel with independent judgement. After the sub-assembly docks water and power, the programmable flow table runs step by step: intelligent water filling to the set flow (PP filter, replaceable), boiler powered to test power and leakage, pump drawing water to test outlet volume and leakage, and the mainboard program verified item by item. Current, power and outlet temperature are sampled throughout, outlet volume is monitored, boiler and pump leakage is judged automatically, any fault triggers protection with a lamp, and the data is uploaded to MES for the record. A master leakage switch rated above 54A plus independent leakage protection per station give two levels of protection, so one tripped station never stops the others. The bench drains water, and all materials are splash-proof and fire-retardant. Takt is 2-3 minutes per unit, about 80-120 machines per hour across four stations.
The assessment follows the leakage current clauses of Chapter 16 and the structural safety clauses of Chapter 22 of GB 4706.1 General requirements for household and similar electrical appliances, with whole-machine safety under GB/T 4706.19-2024; the test flow, parameter ranges and judgement thresholds follow the customer technical agreement and the mainboard program specification.
Off-line sub-assembly testing and mid-line quality checks at coffee machine plants; combined validation of mainboard programs and water-circuit parts; MES digital line integration and UK-plug export line upgrades
Guangdong Endurance Electronic Equipment Co., Ltd provides non-standard customization, drawing confirmation, factory acceptance, on-site installation and commissioning, operation training and long-term technical service; 12-month warranty and long-term spare parts supply. Tel: 0760-88500902 / 13416787649. Web: en.zsnaili.com.
QQ
Service call
Back to the top